Most of the products supplied / used by our Company
are Quality Certified Products such as ISO9001 /
SASO, other National / International Standards to
meet the Qualitative Properties required for executing
the Mechanical System.
EMCC deals directly with leading suppliers /
manufacturers in all fields of procurement such as Air
Conditioning Units, Air Supply & Exhaust Systems & Fire
Fighting Equipment's., etc..
System Execution Process
1
Design Review: The contractual drawings are counter checked, evaluated by our professional engineers to confirm & accept the responsibility of the proposed work.
2
Shop Drawings: Prepared by our engineering team for securing the approvals of consultant/client.
3
Material Submittal: The proposed material to be used is submitted for the approval of consultant/client.
4
Execution: The work is executed as per the approved shop drawings using the approved material & keeping in mind the quality factors & delivery schedule.
5
RFI: Submitting request for inspection to the consultant/client at each phase of the work as per the contract.
6
Future Maintenance: While executing the job, the future maintenance factors are given priority for easy maintenance and safety of equipment.
7
As-Built Drawings: Submission of as-built drawings as per the contract.
8
O&M Manuals: After execution, the site personnel is provided a set of operations & maintenance manuals.
9
Testing & Commissioning: After execution, testing & commissioning of the system is done in the presence of Client/Consultant.
10
Handing-Over: After completion of all the procedures, the Hand-Over/Take-Over documents are signed by both parties.
11
Guarantees: The installed systems are counter guaranteed as per the system manufacturers.
12
Warranty Period: After handing over the system to the site personnel, full technical support is provided during the warranty period specified in the contract.